New York Data Center Moratorium Tracker
New York has 1 state-level data-center restriction in force and 1 active pause. 4 more bills are pending. 37 city and county measures are tracked here, 27 of them in force. Every entry below links to its primary source: a legislature page, a governor's office, a local government, or the reporting of record.
State-level measures in New York
Every statewide moratorium, pause, siting restriction, or tax-incentive rollback in New York we can verify against a primary source. Strongest status first.
| Measure | Status | What it does | Source |
|---|---|---|---|
| EO 62Statewide moratorium on data centers until a condition is met | In force 2026-07 | EO 62: first statewide pause. Holds DEC discretionary approvals for 50+ MW facilities until DPS finishes a generic environmental impact statement, roughly a year, but tied to that study, not a fixed date. The measure runs until a condition is met rather than to a date. | |
| Executive Order 62Statewide hyperscale data center moratorium (executive) | Paused 2026-07 | Gov. Hochul's EO 62 holds state discretionary environmental permits for new hyperscale (50 MW+) data centers in abeyance until the Department of Public Service submits its final Generic Environmental Impact Statement and findings, and the order sets no fixed expiration date. It is the first statewide data-center moratorium in force. | |
| A 10141 / S 9144Three-year halt on data center construction | Proposed 2025 | Would halt all data center construction for a minimum of three years while regulators adopt rules to minimize impacts. Introduced in 2025; pending. Distinct from S10642/A11560, the one-year permitting pause the Legislature passed in 2026. | |
| New YorkNew York S6394A, the Sustainable Data Centers Act, would regulate energy consumption by data centers in the state. | Proposed 2025-03 | New York S6394A, the Sustainable Data Centers Act, would regulate energy consumption by data centers in the state. The bill requires annual disclosure reporting, prohibits fossil fuel power purchase agreements, and directs the Public Service Commission to establish a surcharge/discount plan. It mandates a progressive transition to renewable energy: 33% by 2030, 67% by 2035, and 100% by 2040. The bill is pending committee action. | |
| S8540New York S8540, the Accountability for Computing and Data Centers (ACDC) Act, would require electric and gas corporations to establish an independent | Proposed 2025-10 | New York S8540, the Accountability for Computing and Data Centers (ACDC) Act, would require electric and gas corporations to establish an independent classification of service for large energy use facilities separate from other rate classes. The bill authorizes DPS to develop financial surety requirements and prevents data center costs from being blended into residential rate cases. The bill is pending in the Senate. | |
| S10642 / A11560Responsible Data Center Development Act (one-year moratorium) | Proposed 2026-08 | The Responsible Data Center Development Act passed both the Assembly and Senate on June 4, 2026 (A11560 substituted for S10642). It would impose a one-year statewide moratorium on new permits for data centers over 20 MW peak load. No gubernatorial signature or veto is recorded; Gov. Hochul instead issued Executive Order 62 in July 2026. |
City and county moratoria in New York
Most of the movement is local, where a building pause or permit halt does not need a legislative session. 37 tracked measures in New York, each with its source.
Where New York stands
Across the whole tracker we hold 334 state-level measures in 49 states and 1253 city and county measures, against 1419 primary sources. New York accounts for 6 of the state-level measures and 37 of the local ones.
By total measures on record it is #14 of the 50 states and DC carrying any tracked action, and #13 by city and county measures alone. Ranking is by count of sourced entries in this dataset, so it measures documented activity, not the size of the buildout.
Sources for New York
40 citations behind the entries above. Each opens in a new tab.
- Statewide · EO 62 — 2 separate measures, cited together governor.ny.gov →
- Statewide · A 10141 / S 9144 — Three-year halt on data center construction afslaw.com →
- Statewide · New York — New York S6394A, the Sustainable Data Centers Act, would regulate energy consumption by data centers in the state. nysenate.gov →
- Statewide · S8540 — New York S8540, the Accountability for Computing and Data Centers (ACDC) Act, would require electric and gas corporations to establish an independent nysenate.gov →
- Statewide · S10642 / A11560 — Responsible Data Center Development Act (one-year moratorium) nysenate.gov →
- Canton — Town moratorium on data centers through May 31, 2027 northcountrynow.com →
- City of Auburn — 12-month moratorium on data storage facilities fingerlakes1.com →
- City of North Tonawanda — North Tonawanda Local Law No. 3 of 2026: 12-month extension of data center and crypto mining moratorium theenergymag.com →
- Highland — Local moratorium on data centers through June 18, 2027 townofhighlandny.gov →
- Islip — Local moratorium on data centers through February 12, 2028 longisland.news12.com →
- LeRay — Local moratorium on data centers through August 1, 2027 wwnytv.com →
- Lysander (Onondaga Co.) — Local moratorium on data centers through November 6, 2026 informnny.com →
- Mohawk (Montgomery Co.) and 1 other locality — 2 separate measures, cited together dailygazette.com →
- Newfield (Tompkins Co.) — Local moratorium on data centers through July 9, 2027 tompkinsweekly.com →
- Perth (Fulton Co.) — Local moratorium on data centers through June 4, 2027 dailygazette.com →
- Tonawanda (Erie Co.) — Local moratorium on data centers through August 3, 2027 beenews.com →
- Town of Brookhaven — 18-month data center moratorium tbrnewsmedia.com →
- Town of Clay — One-year moratorium on data centers and high-intensity computing facilities cnycentral.com →
- Town of Clifton Park — Local Law No. 9 of 2026: 12-month moratorium on data storage centers cliftonparkny.gov →
- Town of Dryden (Tompkins County) — Ban on data centers and cryptocurrency mines ithacavoice.org →
- Town of East Fishkill — Three-year data center moratorium spectrumlocalnews.com →
- Town of East Greenbush — Six-month moratorium on data center land use approvals cbs6albany.com →
- Town of Lysander — Six-month data center moratorium townoflysander.org →
- Town of Manlius — 12-month data center and crypto moratorium townofmanlius.gov →
- Town of Oneonta — One-year data center and crypto moratorium wbng.com →
- Town of Orangetown — Six-month moratorium on data centers and battery energy storage westchester.news12.com →
- Town of Perth — One-year data center moratorium dailygazette.com →
- Town of Salina and 1 other locality — One-year data center moratorium wrvo.org →
- Town of Tonawanda — One-year moratorium on data centers of 20 MW or more btpm.org →
- West Seneca — One-Year Moratorium on Data Centers spectrumlocalnews.com →
- City of Buffalo — Proposed two-year data center moratorium spectrumlocalnews.com →
- Ilion — Data center moratorium vote delayed spectrumlocalnews.com →
- Plattsburgh — Proposed 12-month moratorium on high-energy computing facilities cointelegraph.com →
- Potsdam — Proposed town moratorium on data centers northcountrynow.com →
- South Bristol — Proposed ban on constructing data centers and AI computing facilities whec.com →
- St. Lawrence County — Proposed local moratorium on data centers rockinst.org →
- Town of Lansing — Draft local law to prohibit data centers fingerlakes1.com →
- Town of Schroeppel — Proposed 12-month data center moratorium cnycentral.com →
- Town of Tyre — Tyre proposed Local Law 2 of 2026: one-year moratorium on data centers and AI computing facilities tyreny.gov →
- Massena — Town of Massena six-month data center moratorium voted down northcountrypublicradio.org →
What does bind large loads in New York
A moratorium is only one way a data center gets stopped. The grid operator decides whether it can connect at all, and on what terms. New York sits in 1 footprint.
Entire state in NYISO.
States next door
5 of the 5 states bordering New York have at least one data-center measure on record. Restrictions tend to travel between neighbors, so this is usually where the next one comes from.
Data centers in New York
The US Data Center Map identifies 134 facilities run by 72 operators in New York, each one placed from primary sources and listed by city and by operator, with the measures on this page beside them.
Open the New York data center map → · The US Data Center Map →
How to read this page
In force = a moratorium, siting restriction, or tax-incentive rollback that is currently enacted, by statute or executive order. Paused = a temporary hold on new incentives or applications. Proposed = introduced and still pending. Failed / vetoed = died in committee, was voted down, or was vetoed.
This page is generated from the same primary-sourced dataset as the national U.S. Data Center Moratorium Tracker and is re-checked on the same weekly cycle, whether or not anything changed. Legislative status changes quickly; it is informational, not legal advice. Spot something out of date in New York? Tell us.
Companion references: the Data Center Grid Operator Watchlist for the interconnection and curtailment rules that bind here, the Data Center Water Tracker for water mandates, and the Data Center Delay Watchlist for named projects.
Why New York is pushing back
The objections repeat from state to state: strain on the electric grid, water drawn for cooling, and the sense that a facility takes local resources without giving much back. SAVRN builds AI factories designed around those three objections: on-site power that does not lean on the public grid, direct-to-chip cooling that does not consume municipal water, and a training institute that puts local people to work inside the building.