Iowa Data Center Moratorium Tracker
Iowa has 1 state-level data-center restriction in force. 3 more bills are pending. 31 city and county measures are tracked here, 27 of them in force. Every entry below links to its primary source: a legislature page, a governor's office, a local government, or the reporting of record.
State-level measures in Iowa
Every statewide moratorium, pause, siting restriction, or tax-incentive rollback in Iowa we can verify against a primary source. Strongest status first.
| Measure | Status | What it does | Source |
|---|---|---|---|
| HF 976Limits data-center sales/use tax exemptions | In force 2025-06 | Adds expiration dates to previously indefinite sales/use-tax exemptions for electricity and backup fuel (10 years in cities over 30,000; 15 years in smaller cities) plus registration and reporting. Signed June 6, 2025. | |
| HF 2198A bill for an act relating to the disclosure of tax incentives provided to web search portal businesses and data center businesses, and including effective | Proposed 2026-01 | Iowa HF 2198 (2025-2026): A bill for an act relating to the disclosure of tax incentives provided to web search portal businesses and data center businesses, and including effective date provisions.. Last action 2026-01-29: Introduced, referred to Ways and Means.. | |
| HSB 727A bill for an act relating to investment requirements for data center businesses that claim certain sales tax exemptions and sales and use tax refunds. | Proposed 2026-02 | Iowa HSB 727 (2025-2026): A bill for an act relating to investment requirements for data center businesses that claim certain sales tax exemptions and sales and use tax refunds.. Last action 2026-02-23: Committee report approving bill, renumbered as HF 2688.. | |
| SSB 3181A bill for an act making certain sales and use tax exemptions relating to nuclear electric generation facilities, web search portal businesses | Proposed 2026-04 | Iowa SSB 3181 (2025-2026): A bill for an act making certain sales and use tax exemptions relating to nuclear electric generation facilities, web search portal businesses, and data center businesses contingent upon making. Last action 2026-04-14: Committee report approving bill, renumbered as SF 2498.. | |
| HF 2447Iowa HF 2447, proposed by Rep. Cindy Golding (R-Cedar Rapids), creates new reporting requirements and utility rate structures for data centers. | Failed / vetoed 2026-02 | Iowa HF 2447, proposed by Rep. Cindy Golding (R-Cedar Rapids), creates new reporting requirements and utility rate structures for data centers. Data centers must file quarterly reports with the Iowa DNR on water usage (source, volume, efficiency) and quarterly energy reports with the Iowa Utilities Commission (power consumption, on-site generators, sustainability metrics like waste heat reuse). All data must be publicly shared online within 30 days. The bill also requires the Iowa Utilities Commission to create a separate rate class for data centers to prevent grid upgrade costs from being shifted to residents. Separately, HF 2261 would create a new water utility customer class for energy facilities requiring 20+ MW. The bill survived legislative funnel week in February 2026. Iowa adjourned sine die May 3, 2026; the transparency/reporting bill did not become law. |
City and county moratoria in Iowa
Most of the movement is local, where a building pause or permit halt does not need a legislative session. 31 tracked measures in Iowa, each with its source.
Where Iowa stands
Across the whole tracker we hold 334 state-level measures in 49 states and 1253 city and county measures, against 1419 primary sources. Iowa accounts for 5 of the state-level measures and 31 of the local ones.
By total measures on record it is #18 of the 50 states and DC carrying any tracked action, and #15 by city and county measures alone. Ranking is by count of sourced entries in this dataset, so it measures documented activity, not the size of the buildout.
Sources for Iowa
35 citations behind the entries above. Each opens in a new tab.
- Statewide · HF 976 — Limits data-center sales/use tax exemptions nyemaster.com →
- Statewide · HF 2198 — A bill for an act relating to the disclosure of tax incentives provided to web search portal businesses and data center businesses, and including effective legis.iowa.gov →
- Statewide · HSB 727 — A bill for an act relating to investment requirements for data center businesses that claim certain sales tax exemptions and sales and use tax refunds. legis.iowa.gov →
- Statewide · SSB 3181 — A bill for an act making certain sales and use tax exemptions relating to nuclear electric generation facilities, web search portal businesses legis.iowa.gov →
- Statewide · HF 2447 — Iowa HF 2447, proposed by Rep. Cindy Golding (R-Cedar Rapids), creates new reporting requirements and utility rate structures for data centers. axios.com →
- Adams County — 24-month data center moratorium (Resolution 2026-25) adamscounty.iowa.gov →
- Boone County — Moratorium on new data center projects for up to one year kcci.com →
- Buchanan County — County moratorium on data centers for a stated term nbcnews.com →
- City of Peosta — Data center moratorium, extended to June 18, 2027 telegraphherald.com →
- Clarke County — Local moratorium on data centers until a condition is met radioiowa.com →
- Clayton County — Clayton County data center moratorium claytoncountyia.gov →
- Dickinson County — County moratorium on data centers through November 12, 2026 exploreokoboji.com →
- Dubuque — Six-month moratorium on hyperscale data centers kwwl.com →
- Dubuque County — 12-month data center moratorium kcrg.com →
- Emmet County — One-year data center moratorium ktiv.com →
- Henry County — Henry County data center moratorium southeastiowaunion.com →
- Ida County — Local moratorium on data centers until a condition is met radioiowa.com →
- Iowa County — 12-month data center moratorium (Resolution 2026-07-31) iowacounty.iowa.gov →
- Jefferson County — Local moratorium on data centers through August 11, 2027 kilj.com →
- Johnson County — One-year data center moratorium (unincorporated) cbs2iowa.com →
- Linn County and 1 other locality — 2 separate measures, cited together linncountyiowa.gov →
- Madison County — One-year data-processing-facility moratorium news.yahoo.com →
- Marshall County — Proposed county moratorium on data centers timesrepublican.com →
- Marshalltown — Local moratorium on data centers through November 23, 2026 marshalltown-ia.gov →
- Mitchell County — County moratorium on data centers through December 31, 2026 mitchellcounty.iowa.gov →
- Page County — Temporary data center moratorium kmaland.com →
- Plymouth County — One-year revocable data center moratorium klem1410.com →
- Sioux County — One-year data center and BESS moratorium ktiv.com →
- Taylor County — 12-month moratorium on data centers and energy projects kxcv.org →
- Waterloo — Three-month moratorium on data center development wcfcourier.com →
- Woodbury County — 12-month data center moratorium (Resolution 14064) woodburycountyiowa.gov →
- Clinton — Rejected local moratorium on data centers qctimes.com →
- Council Bluffs (data center moratorium denied), IA — Council Bluffs (data center moratorium denied), IA data center moratorium (failed) kmaland.com →
- Hancock County — Six-month data center moratorium (failed for lack of a second) globegazette.com →
- Salix — Rejected one-year data center moratorium iowapublicradio.org →
What does bind large loads in Iowa
A moratorium is only one way a data center gets stopped. The grid operator decides whether it can connect at all, and on what terms. Iowa sits in 2 footprints.
MidAmerican and Alliant (interior/east) in MISO; western fringe co-op/WAPA territory in SPP (Iowa is in SPP's footprint list per FERC).
States next door
6 of the 6 states bordering Iowa have at least one data-center measure on record. Restrictions tend to travel between neighbors, so this is usually where the next one comes from.
Data centers in Iowa
The US Data Center Map identifies 85 facilities run by 31 operators in Iowa, each one placed from primary sources and listed by city and by operator, with the measures on this page beside them.
How to read this page
In force = a moratorium, siting restriction, or tax-incentive rollback that is currently enacted, by statute or executive order. Paused = a temporary hold on new incentives or applications. Proposed = introduced and still pending. Failed / vetoed = died in committee, was voted down, or was vetoed.
This page is generated from the same primary-sourced dataset as the national U.S. Data Center Moratorium Tracker and is re-checked on the same weekly cycle, whether or not anything changed. Legislative status changes quickly; it is informational, not legal advice. Spot something out of date in Iowa? Tell us.
Companion references: the Data Center Grid Operator Watchlist for the interconnection and curtailment rules that bind here, the Data Center Water Tracker for water mandates, and the Data Center Delay Watchlist for named projects.
Why Iowa is pushing back
The objections repeat from state to state: strain on the electric grid, water drawn for cooling, and the sense that a facility takes local resources without giving much back. SAVRN builds AI factories designed around those three objections: on-site power that does not lean on the public grid, direct-to-chip cooling that does not consume municipal water, and a training institute that puts local people to work inside the building.