Vermont Data Center Moratorium Tracker

The one state-level data-center measure on record in Vermont failed or was vetoed. 3 city and county measures are tracked here, 3 of them in force. Every entry below links to its primary source: a legislature page, a governor's office, a local government, or the reporting of record.

Last updated October 2026 1 state-level measure 3 local measures 3 primary sources
Vermont
VT
Failed / vetoed
1
State-level measure on record
3
City and county measures, 3 in force
3
Primary sources cited on this page
#48
of 50 states with anything on record, by measure count

State-level measures in Vermont

Every statewide moratorium, pause, siting restriction, or tax-incentive rollback in Vermont we can verify against a primary source. Strongest status first.

MeasureStatusWhat it doesSource
S.205 / H.727Moratorium on new data centers until 2030 Failed / vetoed 2026-05 Would halt siting and construction of 100 MW+ data centers until Jul 1 2030 pending a Public Utility Commission study; Gov. Scott vetoed the bill and the House failed to override (83-52).

City and county moratoria in Vermont

Most of the movement is local, where a building pause or permit halt does not need a legislative session. 3 tracked measures in Vermont, each with its source.

Morristown
2026-09
In force
Town moratorium on data centers
Selectboard unanimously approved two-year moratorium on data centers and 'high-impact uses', businesses consuming over 10 MW, 57,600 gal/day water, or emitting over 70 dB persistent noise, or adding over 10 acres impervious surface. Exempts small data centers for administrative/operational support. Third Vermont community to pass data center restrictions. The measure has no documented term, applies at a threshold of 10 MW and covers all data center uses.
Royalton
2026-03
In force
Royalton data center moratorium
Royalton, Vermont, voters approved a five-year moratorium on AI and crypto data centers via show-of-hands vote at Town Meeting Day. About 154 of the town's registered voters participated. No data centers have been proposed for the town; the ban is preemptive. The Planning Commission will write the policy into the town plan for Selectboard approval. State Senator Becca White spoke at the meeting about her statewide moratorium bill (S. 205).
South Burlington
2026-08
In force
City moratorium on data centers with no end date
Planning Commission amended Land Development Regulations to ban data centers with footprint exceeding 20,000 sq ft. Facilities under 5,000 sq ft classified as general commercial and exempt. Small-scale (5,000-20,000 sq ft) permitted in mixed industrial-commercial and industrial zones only. Adopted after Gov. Scott vetoed state-level H.727. The measure has no end date by design and applies at a threshold of 20,000 sq ft.

Would you like the weekly update?

Every week we re-verify every state and local measure on this map and publish what changed. You get one email when it goes out.

Also send me

Receive a short introduction on days 3, 7 and 14, plus the updates you select. Unsubscribe in one click. Privacy ·

You're on the list. The next weekly update will land in your inbox when it publishes.
You are subscribed. Read the latest tracker

Where Vermont stands

Across the whole tracker we hold 334 state-level measures in 49 states and 1253 city and county measures, against 1419 primary sources. Vermont accounts for 1 of the state-level measures and 3 of the local ones.

By total measures on record it is #48 of the 50 states and DC carrying any tracked action, and #45 by city and county measures alone. Ranking is by count of sourced entries in this dataset, so it measures documented activity, not the size of the buildout.

Sources for Vermont

3 citations behind the entries above. Each opens in a new tab.

  • Statewide · S.205 / H.727 — Moratorium on new data centers until 2030 (Failed / vetoed, 2026-05) legislature.vermont.gov →
  • Morristown and 1 other locality — 2 separate measures, cited together (In force, 2026-08 to 2026-09) sevendaysvt.com →
  • Royalton — Royalton data center moratorium (In force, 2026-03) vnews.com →

See all 1419 sources across every state →

What does bind large loads in Vermont

A moratorium is only one way a data center gets stopped. The grid operator decides whether it can connect at all, and on what terms. Vermont sits in 1 footprint.

ISO-NEDominant
Little growth yet; proposing bring-your-own-generation for new large loads.

Entire state in ISO-NE.

See the full Data Center Grid Operator Watchlist →

States next door

3 of the 3 states bordering Vermont have at least one data-center measure on record. Restrictions tend to travel between neighbors, so this is usually where the next one comes from.

Data centers in Vermont

The US Data Center Map identifies 8 facilities run by 7 operators in Vermont, each one placed from primary sources and listed by city and by operator, with the measures on this page beside them.

Open the Vermont data center map → · The US Data Center Map →

How to read this page

In force = a moratorium, siting restriction, or tax-incentive rollback that is currently enacted, by statute or executive order. Paused = a temporary hold on new incentives or applications. Proposed = introduced and still pending. Failed / vetoed = died in committee, was voted down, or was vetoed.

This page is generated from the same primary-sourced dataset as the national U.S. Data Center Moratorium Tracker and is re-checked on the same weekly cycle, whether or not anything changed. Legislative status changes quickly; it is informational, not legal advice. Spot something out of date in Vermont? Tell us.

Companion references: the Data Center Grid Operator Watchlist for the interconnection and curtailment rules that bind here, the Data Center Water Tracker for water mandates, and the Data Center Delay Watchlist for named projects.

Why Vermont is pushing back

The objections repeat from state to state: strain on the electric grid, water drawn for cooling, and the sense that a facility takes local resources without giving much back. SAVRN builds AI factories designed around those three objections: on-site power that does not lean on the public grid, direct-to-chip cooling that does not consume municipal water, and a training institute that puts local people to work inside the building.

See how a SAVRN factory works Talk to us about a Vermont site