New Jersey Data Center Moratorium Tracker
New Jersey has 4 state-level data-center restrictions in force. 5 more bills are pending. 109 city and county measures are tracked here, 97 of them in force. Every entry below links to its primary source: a legislature page, a governor's office, a local government, or the reporting of record.
State-level measures in New Jersey
Every statewide moratorium, pause, siting restriction, or tax-incentive rollback in New Jersey we can verify against a primary source. Strongest status first.
| Measure | Status | What it does | Source |
|---|---|---|---|
| New JerseyNew Jersey: In New Jersey, Gov. Mikie Sherrill signed on her first day in office, Declaring a state of emergency on utility costs. | In force 2026-01 | In New Jersey, Gov. Mikie Sherrill signed on her first day in office, Declaring a state of emergency on utility costs. Directs BPU to require electric utilities to report on energy requests from data centers ('ghost loads'). Identifies data center demand surge as key driver of NJ's energy crisis. Key concerns driving this action include tax incentive policy and water consumption. The outcome remains pending. | |
| S4390/A5165New Jersey: NJ Assembly passed S4390/A5165 74-4 on 2026-06-30, redirecting $250M in uncommitted AI/data-center tax credits under the Next New Jersey Program | In force 2026-06 | NJ Assembly passed S4390/A5165 74-4 on 2026-06-30, redirecting $250M in uncommitted AI/data-center tax credits under the Next New Jersey Program to other economic-development priorities; the $250M already awarded to projects stays intact. Gov. Sherrill signed the bill on 2026-07-07. Confirmed signed 2026-07-07 -- do not conflate with the three other energy bills Sherrill also signed that day (Data Center Fair Share Act S731/A796, Repeal ROE Adder S1673/A2757, Advanced Grid Technologies Act S4411/A5188) as part of a $1B/year ratepayer relief package. | |
| Data Center Fair Share ActData center ratepayer class and cost obligations | In force 2026-07 | Signed by Gov. Sherrill; requires 50 MW+ data centers to commit to paying at least 85% of projected power costs for a decade and creates a separate ratepayer class. A cost restriction, not a moratorium. | |
| S-3379 / A-4096Data center energy and water use reporting | In force 2026-08 | Signed by Gov. Sherrill on Aug. 27, 2026 and effective immediately. Requires data center owners and operators to file semiannual reports with the Board of Public Utilities for three years covering total energy consumption, energy used for cooling versus IT equipment, peak daily water use, water sources, and on-site and backup power supplies. It applies to existing and new facilities above the statutory capacity threshold. It is a disclosure requirement, not a moratorium; the Governor declined calls for a statewide construction ban at the signing. | |
| S680New Jersey: S-680 would mandate clean energy sourcing for new AI data centers, requiring all electricity from new renewable or nuclear generation measured | Proposed 2026-01 | S-680 would mandate clean energy sourcing for new AI data centers, requiring all electricity from new renewable or nuclear generation measured hourly. Takes effect only after a majority of PJM states enact comparable requirements. Advancing through committees as of April 2026. | |
| New Jersey (Democratic legislators announce AI data-center tax-credit repeal; Kenilworth CoreWeave protest), NJNew Jersey: Three Democratic legislators announced a bill to repeal the state AI data-center tax credit (created under Murphy), amid residents protesting | Proposed 2026-05 | Three Democratic legislators announced a bill to repeal the state AI data-center tax credit (created under Murphy), amid residents protesting CoreWeave's planned $1.8B AI data center on the former Merck/NEST site in Kenilworth. The Kenilworth Planning Board had approved CoreWeave's 4-lot subdivision April 28. | |
| New Jersey (Gov. Sherrill unveils statewide data center plan; no moratorium)New Jersey: On May 28, 2026, Gov. Mikie Sherrill unveiled a four-part statewide data center plan: clean-energy/grid-cost requirements, mandatory energy | Proposed 2026-05 | On May 28, 2026, Gov. Mikie Sherrill unveiled a four-part statewide data center plan: clean-energy/grid-cost requirements, mandatory energy and water reporting, statewide Community Benefits Agreement standards (noise/light/pollution), and labor/prevailing-wage standards. She stopped short of the moratorium that 60+ groups had demanded. Food & Water Watch (Matt Smith) and Jeff Tittel called it 'entirely inadequate' and renewed calls for a full moratorium. Alongside the plan, the NJ Economic Development Authority reportedly froze new applications to its $250M data center tax-incentive program (previously approved awards, such as CoreWeave’s, unaffected). | |
| A 5482Establishes six month moratorium on approvals, construction, expansion, subsidies, and tax incentives for certain artificial intelligence data centers | Proposed 2026-09 | New Jersey A 5482 (222): Establishes six month moratorium on approvals, construction, expansion, subsidies, and tax incentives for certain artificial intelligence data centers; creates Artificial Intelligence Data Center. | |
| S 4659Requires DEP to conduct study on environmental impacts of data center development in State; prohibits construction of new data centers until study is complete. | Proposed 2026-09 | New Jersey S 4659 (222): Requires DEP to conduct study on environmental impacts of data center development in State; prohibits construction of new data centers until study is complete.. | |
| A 4033Establishes program in EDA providing tax credits and exemptions to certain qualified data centers. | Failed / vetoed 2017-01 | New Jersey A 4033 (217): Establishes program in EDA providing tax credits and exemptions to certain qualified data centers.. Last action 2017-01-30: Reported and Referred to Assembly Appropriations Committee. | |
| A5462New Jersey: Directs electric public utilities to file a new tariff for large load customers (100+ MW/month) with the BPU, designed to ensure non-data-center | Failed / vetoed 2026-01 | Directs electric public utilities to file a new tariff for large load customers (100+ MW/month) with the BPU, designed to ensure non-data-center ratepayers are protected from increased costs caused by massive electricity demand. Gov. Murphy pocket-vetoed the original bill before leaving office in January 2026. Reintroduced in the new session as S731/A796, which passed the New Jersey General Assembly with bipartisan support. Clarification: this was a pocket veto (no action taken by January 21, 2026 deadline), not a conditional veto. The bill was reintroduced as S731/A796. |
City and county moratoria in New Jersey
Most of the movement is local, where a building pause or permit halt does not need a legislative session. 109 tracked measures in New Jersey, each with its source.
Where New Jersey stands
Across the whole tracker we hold 334 state-level measures in 49 states and 1253 city and county measures, against 1419 primary sources. New Jersey accounts for 11 of the state-level measures and 109 of the local ones.
By total measures on record it is #1 of the 50 states and DC carrying any tracked action, and #1 by city and county measures alone. Ranking is by count of sourced entries in this dataset, so it measures documented activity, not the size of the buildout.
Sources for New Jersey
64 citations behind the entries above. Each opens in a new tab.
- Statewide · New Jersey — New Jersey: In New Jersey, Gov. Mikie Sherrill signed on her first day in office, Declaring a state of emergency on utility costs. nj.gov →
- Statewide · S4390/A5165 — New Jersey: NJ Assembly passed S4390/A5165 74-4 on 2026-06-30, redirecting $250M in uncommitted AI/data-center tax credits under the Next New Jersey Program nj.gov →
- Statewide · Data Center Fair Share Act — Data center ratepayer class and cost obligations nj.gov →
- Statewide · S-3379 / A-4096 — Data center energy and water use reporting newjerseymonitor.com →
- Statewide · S680 — New Jersey: S-680 would mandate clean energy sourcing for new AI data centers, requiring all electricity from new renewable or nuclear generation measured nixonpeabody.com →
- Statewide · New Jersey (Democratic legislators announce AI data-center tax-credit repeal; Kenilworth CoreWeave protest), NJ — New Jersey: Three Democratic legislators announced a bill to repeal the state AI data-center tax credit (created under Murphy), amid residents protesting newjersey.news12.com →
- Statewide · New Jersey (Gov. Sherrill unveils statewide data center plan; no moratorium) — New Jersey: On May 28, 2026, Gov. Mikie Sherrill unveiled a four-part statewide data center plan: clean-energy/grid-cost requirements, mandatory energy jerseyvindicator.org →
- Statewide · A 5482 — Establishes six month moratorium on approvals, construction, expansion, subsidies, and tax incentives for certain artificial intelligence data centers njleg.state.nj.us →
- Statewide · S 4659 — Requires DEP to conduct study on environmental impacts of data center development in State; prohibits construction of new data centers until study is complete. njleg.state.nj.us →
- Statewide · A 4033 — Establishes program in EDA providing tax credits and exemptions to certain qualified data centers. njleg.state.nj.us →
- Statewide · A5462 — New Jersey: Directs electric public utilities to file a new tariff for large load customers (100+ MW/month) with the BPU, designed to ensure non-data-center newjerseymonitor.com →
- Allamuchy Township — Allamuchy Ordinance 2026-06 designating data centers a prohibited use allamuchynj.org →
- Alpha and 23 other localities — 24 separate measures, cited together pinelandsalliance.org →
- Andover and 30 other localities — 31 separate measures, cited together patch.com →
- Andover Township Committee (Sussex County, ban announced after viral tense meeting at former Newton/Jump airport site), NJ — Ordinance prohibiting data centers in all zones townshipjournal.com →
- Bayonne — Citywide ban on data centers hudsoncountyview.com →
- Bridgewater Township — Supplemental zoning regulations for data centers (Ordinance 26-15) patch.com →
- Chesterfield — Local moratorium on data centers with no end date inquirer.com →
- Clark — Municipal ban on data centers ourclark.com →
- Collingswood — Collingswood Ordinance 1838 banning data centers and computing nodes collingswood.com →
- Cranford — Local moratorium on data centers with no end date patch.com →
- Cresskill — Municipal ban on data centers cresskillboro.com →
- East Brunswick — Ordinance banning data centers patch.com →
- Franklin Township (Gloucester County) and 3 other localities — 4 separate measures, cited together nj.gov →
- Glassboro — Local moratorium on data centers with no end date thewhitonline.com →
- Gloucester Township (Camden County) — Ordinance prohibiting large-scale data centers glotwp19.wpenginepowered.com →
- Greenwich Township (Warren County) — Ordinance prohibiting data centers greenwichtownship.org →
- Hampton Township (Sussex County) — Ordinance prohibiting data centers in all zones hamptontownshipnj.info →
- Hardyston Township (Sussex County) — Ordinance prohibiting data centers in all zones advertisernewssouth.com →
- Jackson — Ordinance banning data centers jerseyshoreonline.com →
- Madison — Local moratorium on data centers with no end date patch.com →
- Manalapan Township — Ordinance 2026-09 deleting data centers as a permitted use mtnj.org →
- Manchester Township — Ordinance removing data centers as a permitted use jerseyshoreonline.com →
- Mansfield Township (Burlington Co.) — Local moratorium on data centers with no end date yahoo.com →
- Mantua Township — Local moratorium on data centers with no end date mantuatownship.com →
- Millville Board of Commissioners (Cumberland County, total data center ban), NJ — Millville Board of Commissioners (Cumberland County, total data center ban), NJ data center moratorium newjersey.news12.com →
- Monroe Township (Gloucester Co.) — Local moratorium on data centers with no end date cbsnews.com →
- New Brunswick — Rejection of 100 Jersey Avenue data center; use removed from redevelopment plan jerseyvindicator.org →
- Newark — Dept/ Agency: Offices of Municipal Council/City Clerk Action: ( ) Ratifying (X) Authorizing ( ) Amending Type of Service: Expressing Support Purpose newark.legistar.com →
- North Brunswick — Ordinance banning data centers roi-nj.com →
- North Plainfield — Local moratorium on data centers with no end date northplainfieldnj.gov →
- Old Bridge — Local moratorium on data centers oldbridge.com →
- Peapack-Gladstone — Peapack-Gladstone Ordinance 1171-2026 designating data centers a non-permitted use in all zones peapackgladstone.org →
- Pennsville — Local moratorium on data centers with no end date pennsville.org →
- Phillipsburg — Phillipsburg ordinance prohibiting data centers wrnjradio.com →
- Pittsgrove Township — Pittsgrove Ordinance 2026-06 prohibiting data centers in all zoning districts pittsgrovetownship.com →
- Raritan Township (Hunterdon County) — Raritan Township ordinance adding data centers to prohibited uses wrnjradio.com →
- Ridgefield Park (Bergen County) — Ordinance prohibiting data centers in all zones ridgefieldpark.org →
- Roselle Park — Ordinance prohibiting data centers in all zone districts ecode360.com →
- Sayreville — 18-month data center moratorium magic983.com →
- Stafford Township — Ordinance banning data centers patch.com →
- Washington Borough (Warren County) — Municipal ban on data centers washingtonboro-nj.gov →
- Washington Township (Burlington County) — Ordinance prohibiting data centers, fulfillment centers and warehouses pinebarrenstribune.com →
- Waterford Township (Camden Co.) — Local moratorium on data centers with no end date nj1015.com →
- Asbury Park — Resolution calling for a pause on data center applications newjersey.news12.com →
- Brick Township — Proposed ordinance defining data centers as a use not permitted in any zone jerseyshoreonline.com →
- Chatham Borough — Proposed municipal ban on data centers newjerseyhills.com →
- Cinnaminson — Proposed municipal ban on data centers cinnaminsonnj.org →
- Hanover Township (Morris County) — Proposed ban on high-density data centers newjerseyhills.com →
- Lawrence Township — Ordinance to Prohibit Data Centers Townshipwide mercerme.com →
- Linden — Proposed ordinance prohibiting AI data centers newjerseyglobe.com →
- Middletown Township (Monmouth County) — Proposed ordinance prohibiting data centers in all zones publicrecordnj.com →
- Millburn Township (Essex County) — Proposed ordinance prohibiting large data centers twp.millburn.nj.us →
- Rockaway Borough (Morris County) — Proposed ban on large-scale data centers newjerseyhills.com →
What does bind large loads in New Jersey
A moratorium is only one way a data center gets stopped. The grid operator decides whether it can connect at all, and on what terms. New Jersey sits in 1 footprint.
Entire state in PJM (PSE&G, JCP&L, Atlantic City Electric, Rockland Electric).
States next door
3 of the 3 states bordering New Jersey have at least one data-center measure on record. Restrictions tend to travel between neighbors, so this is usually where the next one comes from.
Data centers in New Jersey
The US Data Center Map identifies 121 facilities run by 54 operators in New Jersey, each one placed from primary sources and listed by city and by operator, with the measures on this page beside them.
Open the New Jersey data center map → · The US Data Center Map →
How to read this page
In force = a moratorium, siting restriction, or tax-incentive rollback that is currently enacted, by statute or executive order. Paused = a temporary hold on new incentives or applications. Proposed = introduced and still pending. Failed / vetoed = died in committee, was voted down, or was vetoed.
This page is generated from the same primary-sourced dataset as the national U.S. Data Center Moratorium Tracker and is re-checked on the same weekly cycle, whether or not anything changed. Legislative status changes quickly; it is informational, not legal advice. Spot something out of date in New Jersey? Tell us.
Companion references: the Data Center Grid Operator Watchlist for the interconnection and curtailment rules that bind here, the Data Center Water Tracker for water mandates, and the Data Center Delay Watchlist for named projects.
Why New Jersey is pushing back
The objections repeat from state to state: strain on the electric grid, water drawn for cooling, and the sense that a facility takes local resources without giving much back. SAVRN builds AI factories designed around those three objections: on-site power that does not lean on the public grid, direct-to-chip cooling that does not consume municipal water, and a training institute that puts local people to work inside the building.
See how a SAVRN factory works Talk to us about a New Jersey site