Skip to page content
SAVRN
Search Plan a project
SAVRN Research · Capital Atlas · Alaska

Alaska Data Center Investment Tracker

Alaska carries 1 named site commitment, set against 1 project blocked, delayed or restricted, 1 of them moratoria or delays, as of October 8, 2026.

Updated October 8, 2026 1 named site 1 blocked, delayed or restricted 0 financing transactions 2 sources
Alaska
AK
1 capital provider on record
Named sites
1
Site-level commitments the atlas records in Alaska
Disclosed capital floor
n.a.
Sum of sites with a stated dollar figure. Sites without one are listed, not counted
Disclosed capacity
100 MW
Sum of sites with a stated megawatt figure
Blocked, delayed or restricted
1
Projects on the capital-at-risk record here
Who is investing

Who is investing in data centers in Alaska?

The named commitments in Alaska carry no disclosed dollar figure yet. The record is .
Named sites

Named data center sites in Alaska

Each row is one site-level commitment with its capital provider, the figure the source states, and the status the source gives it. Capital is shown as one compact figure; the verbatim wording is in the row's sources.

SiteCapital providerPlaceCapitalMWStatusSources
Cook Inlet Subsea-Compute and Infrastructure Hub (East Foreland corridor)
FERC notice of accepted preliminary permit application 4 September 2026 (Peninsula Clarion, 14 September 2026)
DeepGreen Cook Inlet SPV LLC Offshore Nikiski (landing in the Nikiski industrial corridor), Kenai Peninsula Borough n.a. 100 proposed
Capital at risk

Blocked, delayed or restricted in Alaska

Every project in Alaska on the atlas's capital-at-risk record: the action taken, who took it, and the announced capital affected. Restarts and reversals are recorded with the same weight as blocks.

ProjectDeveloperJurisdictionActionCapitalSources
Anchorage data center moratorium
moratorium Enacted March 2026
n.a. Anchorage
Anchorage, Alaska, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated March 2026. AO 2026-27: defines data centers (20+ MW) in zoning code, restricts to commercial/industrial zones, bans from residential, requires conditional use review, utility capacity statement, landscaping buffers and enclosed power equipment. The measure has no end date by design.
n.a.
Policy context

What governs a data center in Alaska

The policy layer for Alaska lives in three companion references: the Alaska Data Center Moratorium Tracker for every state measure and local moratorium on record, the Water Tracker for the water rules that touch a site, and the Grid Operator Watchlist for the large-load rules of the RTO or utility that decides whether it can energize.

On the map

Data centers in Alaska

The US Data Center Map identifies 6 facilities run by 4 operators in Alaska, each one placed from primary sources and listed by city and by operator, with this atlas record beside it.

Sources

Sources for Alaska

Every source cited on this page, once each. The full atlas source register is at Capital Atlas sources.

The SAVRN reference set

Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.
Check an address →